A catastrophic structure fire resulted in the complete loss of Era Valdivia Contractors’ office and storage warehouse. BEAR worked as the design-build general contractor to complete this 9,600-SF complex interior and exterior renovation. A complete gut of the 1970’s era building and recent link building addition was required, including an in-depth structural components study. The existing shingled mansard roof was replaced and new rooftop skylights and completely new MEP/FP systems were added throughout. Top of the line finishes and office amenities also rounded out the new and modern office for EVC.
Following the success of this project, BEAR was then asked to demo and replace their damaged operations and maintenance building.