Project Details

BEAR was engaged to provide design-build services for the first construction project on a newly acquired 9-acre property in the Northwoods. BEAR contracted with architect K2N Crest after reviewing the needs of the client. Both BEAR and K2N worked together to develop design documents with future property development in mind. Phase 1 consisted of two (2) 12,000 SF Pre-Engineered Metal Buildings (PEMB) for boat storage. Due to the early winter season and very challenging lead times for materials, BEAR worked through freezing weather conditions in late November/early December to ensure the buildings were completed before the arrival of heavy snow. As such, our happy client was able to safely store their boats, as needed.

BEAR is currently engaged in phase 2 to install a new 12,000-SF insulated PEMB and small asphalt parking lot.